Warranty
The best answer for each type of project
Contact with us
More than 25 years rehabilitating buildings and building your confidence.
Learn more about our warranties
This is a question we are asked quite often and it is certainly not easy to answer. Carrying out renovation work in a home is not the same as changing the television or any other household appliance. In this type of work, it is necessary to take into account the initial conditions of the property that are going to be modified and, in the event of any type of incident occurring a posteriori, the verification of whether or not it has necessarily been caused by the renovation work carried out.
In any case, both the Law for the Defence of Consumers and Users 1/2007 and the LOE (Law for the Regulation of Building 38/1999) and the Civil Code detail the guarantees that are observed when renovating a home:
En la prestación de servicios, señala 6 meses de plazo máximo para la reclamación de un vicio oculto.
En caso de llevarse a cabo cambios sustanciales en la construcción inicial, una reforma de la estructura o una obra de nueva planta, se respetarán los mismos plazos que si fuera una nueva edificación:
- 1 año: para los defectos detectados en terminaciones y acabados como pintura, alicatado o revestimiento de la vivienda.
- 3 años: para los defectos que impidan o dificulten la habitabilidad de dicha vivienda (humedades y falta de aislamiento acústico o térmico)
- 10 años: para aquellos otros defectos que afecten a la estructura del edificio comprometiendo su estabilidad.
Para poder exigir la responsabilidad de los agentes de la construcción implicados, se dispone de un plazo máximo de 2 años desde que se descubra el vicio o defecto constructivo.
En caso de que la reforma no haya cumplido las especificaciones del proyecto o exista incumplimiento contractual, el plazo establecido para poder reclamar es de 5 por no haber cumplido el contrato.
Where to start
01.
Start of Plan | Project
After receiving your call, we will come to your home to collect all the information.
02.
Technical study of the project
Once everything has been studied, we draw up a technical study and give you an estimate.
03.
Implementation and commissioning
If you accept the proposal, start the implementation of the project within the agreed deadlines.
Our
certifications
We are registered in the REA, the register that certifies that construction companies meet all the requirements in the field of occupational risk prevention. As well as in the RERA (work with asbestos). At COPASA we are confident that our work will be optimal and with guarantees.
Financing.
We make it easy
We leave nothing to chance, not even tailor-made financing. Contact us to determine the type of financing your project needs. Without obligation and with all the guarantees offered by our company.
Our address:
C/ Carrer de la Costa 020. Edificio Oruidia P.B.5, Ransol (Principat D’Andorra)
Opening hours:
From monday to thursday
08:00h to 14:30h
15:30h to 17:30h
Friday
08:00h to 14h
Phone: 937 073 635
Email: info@copasandorra.com
Financing
Check out our financing and don’t worry about anything. We take care of everything.
Do you have any doubts or concerns about your project? No need to worry, here you have the most frequent doubts that usually arise in these cases.